TITLE:title
Wastewater Treatment Capacity - Monthly Update
body
INFORMATION CONTACT:
John Shutak, Union County Water, Engineering Director, 704-283-3651
ACTION REQUESTED:
None - Information only
PRIOR BOARD ACTIONS:
None
BACKGROUND:
Union County Water is closely monitoring the wastewater treatment capacities at our Water Reclamation Facilities. Permitting Capacity is evaluated using the Actual Plant Flows plus the Permitted/Obligated Flows (unconnected). Union County Water was asked to provide regular updates. Plant flow information through July 2025 is summarized in the attached table.
Twelve Mile Creek
• Percent of Actual Flows = 70.3%
• Percent of Actual + Permitted Flows = 89.7%
• Actual Flows (MGD) = 5.270
• Actual + Permitted Obligated Flows (MGD) = 6.728
Crooked Creek
• Percent of Actual Flows = 59.3%
• Percent of Actual + Permitted Flows = 91.4%
• Actual Flows (MGD) = 1.127
• Actual + Permitted Obligated Flows (MGD) = 1.736
Olde Sycamore
• Percent of Actual Flows = 26.7%
• Percent of Actual + Permitted Flows = 26.7%
• Actual Flows (MGD) = 0.040
• Actual + Permitted Obligated Flows (MGD) = 0.040
Tallwood
• Percent of Actual Flows = 42.0%
• Percent of Actual + Permitted Flows = 42.0%
• Actual Flows (MGD) = 0.021
• Actual + Permitted Obligated Flows (MGD) = 0.021
Grassy Branch
• Percent of Actual Flows = 84.0%
• Percent of Actual + Permitted Flows = 86.0%
• Actual Flows (MGD) = 0.042
• Actual + Permitted Obligated Flows (MGD) = 0.043
In addition to the wastewater treatment capacities, flow volumes associated with development projects that are in the planning and review process within the Twelve Mile Creek and Crooked Creek WRF service areas are provided for information as well. Development flow volumes through July 2025 are summarized in the attached tables.
FINANCIAL IMPACT:
None